Open the box, verify the contents, and visually inspect the items for any shipping damage. If necessary, contact Haivision for return instructions.
Unpack the box and position the hardware on a stable work surface. Optionally, mount the device in a server rack.
Caution
When mounting in a server rack, refer to your rack vendor's documentation as well as the included rack mount instructions in the rail kit provided with your system. Improper rack mounting could cause serious harm to equipment and/or people near the rack. Please be sure to properly and securely mount your hardware.
Ensure that the final location has proper airflow. Do not block or impede airflow to the vents.
Lors du montage dans un rack de serveurs, consultez la documentation fournie par le fabricant du rack ainsi que les instructions de montage fournies dans le kit de rails fourni avec votre système. Un montage incorrect pourrait causer des dommages importants à l'équipement et/ou aux personnes se trouvant à proximité du rack. Veillez à monter correctement et solidement votre matériel.
Assurez-vous que l'emplacement final permette de bonne circulation d'air. Ne bloquez ou n'empêchez pas la circulation de l'air vers les ventilateurs. TBD
On the device:
Connect to your network using an Ethernet cable. For most configurations, use the port labeled Gb1 or NIC0.
For initial setup purposes, attach a mouse, keyboard, and monitor to the available USB and VGA ports.
If necessary, connect any cables to the available I/O ports as shown in the following diagram(s).
Attach the power cord to the power receptacle.
On the front of the device, press the button to power it on. The power LED lights.
Tip
To configure Kraken to capture CoT or KLV metadata from the serial port, connect the serial connector to the serial port of a computer.